Solution
The Prologis Essentials team helped Premium Guard view their warehousing logistics and infrastructure needs holistically to maximize cost savings and reduce the time required to make the extensive transition. The team proposed a comprehensive turnkey solution that included racking, lighting, utility carts, material handling and docking doors with a streamlined implementation process to minimize downtime. This enabled Premium Guard to focus on what matters—keeping their customers happy.
Implementation
Prologis Essentials implemented over 50,000 pallet positions of structural steel racking—including deconstruction, transportation and reconstruction—which were completed three months ahead of expectations. Throughout the warehouse and office spaces, 660 new LED fixtures were installed and extensive electrical work was completed. Prologis also worked to find creative ways to patch, repair and reuse existing materials to meet Premium Guard’s needs for docking doors, resulting in cost savings and a significant reduction in time compared to competitor quotes.